Hi,
I created a copy of the Light Optimize BPC Process Chain and only included an additional Variant leaving everything else as is. When I went to transport the BW Transport Mgr was suggesting to send over all of the default BPC Variants as well. Thinking I should not include the default Variants since they will already exist in target system I only included the New Chain ID, New Trigger, and new variant in the transport.
When I try to release the transport i get error messages and the transport will not release.
The messages are:
Object Directory entry R3TR RSPV BPCCLEAR /CPMB/CLEAR does not exist
Object Directory entry R3TR RSPV BPCMODIFY /CPMB/MODIFY does not exist
Object Directory entry R3TR RSPV DBSTAT /CPMB/CREATE_STATISTICS does not exist
etc...
Any idea what is going on here?
Thanks for any help...