Dear Friends,
My client wants different requirement regarding the monitoring of the Room Temperature.
Requirement:
he will receive the material with batch number and kept in the cold room . That cold room has the 300 Hr's. Whenever he wants to use that material in the production he will take the material from the cold room and again he will be kept in the cold room. Tha material has the 09 inspection type is there
For exapmle once he will take the material from the cold room and use some quantity in the production takes 20 min. again he will kept the cold room remainig quantity. like that he will use the process. Once complete the 300 hr's remaining quantity will be moved to blocked stock.
Please help how i will do this in the QA side.
Regards,
Anitha